Development Control Plan Chapter 25

Objectives

This Development Control Plan aims to achieve the following:

  1. Provide a rear laneway and carparking.
       
  2. Provide for a maximum floor space ratio of 1:1.
       
  3. Provide for the orderly and economic development of the land.

This Development Control Plan (DCP) may be amended from time to time by Council. Proposed amendments are required to be advertised and exhibited in draft form and any submissions received must be considered by Council before the amended plan is adopted. People using this DCP should ensure that they have the current copy of the plan, including any amendments. If in doubt, please check with Council’s Customer Service Centre.

The Development Control Plan has been prepared pursuant to Section 72 of the Environmental Planning and Assessment Act, 1979 and Clause 24 of the Environmental Planning and Assessment Act Regulations, 1980.

Land to which this plan applies:

This plan applies to Lots 280 and 281 DP 786453 and Lots 29, 31 and 32 DP 17931 and Lot 2 DP 712945 Main Road, Toukley between Summerside Street and Lakeview Street.

Implementation:

In its determination of applications for the development of the land to which this plan applies Council will require:

  1. The dedication of the rear 12 metres of the property, at no cost to Council for rear laneway and carparking purposes.
       
  2. The construction of carparking at the rear of the land in accordance with the map supporting this plan, at no cost to Council.
       
  3. Where appropriate Council accept a cash contribution towards future laneway construction where the location of the proposed laneway renders construction at the time of development impracticable.
       

    1. The maximum floor space ratio for development is 1:1. The floor space ratio means the ratio of the gross floor area of a building to the site area.
         
    2. For the purpose of calculating the floor space ratio for development the site area is to be taken as that existing prior to dedication to Council for the purpose of the rear laneway and carparking.

  4. Carparking will be required to be provided in accordance with Council's Carparking Code. Council may require a contribution for any deficiency in carparking that is not provided on the land.
       
  5. When development or redevelopment occurs on Lots 280 PD 786453 and 32 DP 17931 Council will require the dedication to Council at no cost to Council of a splay corner 3 metres x 3 metres for sight distance purposes to improve traffic safety.

Savings Provision

Any person making application for the development of properties affected by this plan shall have due regard for the provisions of Wyong Local Environmental Plan 1987 Urban Lands and of any other development codes as are adopted by Council at the time of application.

Council reserves the right to vary the requirements of the plan to a minor extent, only having regard to the physical constraints of any given site or any improvements erected thereon.

Figure 1 – Locality Plan