The capital works programmes proposed for the described period are detailed below in:

Rolling Works Programme Water Supply 2001/2002
Rolling Works Programme Sewerage 2001/2002

Rolling Works Programme Water Supply 2002/2003
Rolling Works Programme Sewerage 2002/2003

Rolling Works Programme Water Supply 2003/2004
Rolling Works Programme Sewerage 2003/2004

Rolling Works Programme Water Supply 2004/2005
Rolling Works Programme Sewerage 2004/2005


Rolling Works Programme Water Supply 2001/2002

Asset Project Location Budget Allocation
WATER
    $3,845,000
RESERVOIRS
    $175,000
  Replace roof at Ourimbah Reservoir Ourimbah
 
  Replace stairs at Kanwal Reservoir Kanwal
 
  Replace roof at Wyong Reservoir Wyong
 
MAINS
    $2,650,000
  Replace tapping bands/fittings Shelly Beach  
    Killarney Vale
 
    Gorokan
 
  Refurbish corroded steel mains (1) Wyong
 
  Install valve bypasses Kanwal & Mardi
 
  Install water meters on parks and reserves
The Entrance  
  Replace old and high use water meters Shire
 
  Watermain refurbishment Tacoma
 
    Wyong
 
  Repaint Wyong River crossing Wyong
 
  Construct dismantling pits (for pipe scouring) Berkeley Vale
 
  Watermain adjustments (Roads & Drainage) Tumbi
 
    Gorokan
 
    San Remo
 
    Long Jetty  
    Charmhaven
 
    Toowoon Bay  
    Killarney Vale  
    Berkeley Vale
 
  Trunk main Mardi to Warnervale (Stage 1) (2) Wyong
 
WATER TREATMENT     $470,000
  Fish ladder at Upper Ourimbah Weir (3)
Palmdale
 
  Replace Mardi PLC (11) Mardi
 
  Refurbish master back wash valve at WTP (9) Mardi
 
  Riverbank Rehabilitation Yarramalong
 
  Clear water tank modifications (7) Mardi
 
WATER PUMP STATIONS     $225,000
  Overhaul Pump Station 1 (8)
Wyong
 
  Refurbish valves at PS11 (9) Palmdale
 
  Provide motorised valve at Pump Station 17 (10)
Ourimbah
 
GENERAL     $325,000