The capital works programmes proposed for the above period are detailed below in:

Rolling Works Programme Water Supply 2001/2002
Rolling Works Programme Sewerage 2001/2002

Rolling Works Programme Water Supply 2002/2003
Rolling Works Programme Sewerage 2002/2003

Rolling Works Programme Water Supply 2003/2004
Rolling Works Programme Sewerage 2003/2004

Rolling Works Programme Water Supply 2004/2005
Rolling Works Programme Sewerage 2004/2005


Rolling Works Programme Water Supply 2002/2003

Asset Project Location Budget Allocation
WATER
    $3,070,000
RESERVOIRS
    $190,000
  Refurbish pumps at Sandhills Reservoirs
Bateau Bay
 
  Replace roofs at Sandhills Reservoirs
Bateau Bay
 
MAINS
    $2,530,000
  Replace tapping bands/fittings Toowoon Bay  
    Blue Haven
 
    Gorokan
 
  Refurbish corroded steel mains (1) Wyong
 
  Install valve bypasses Wadalba
 
  Replace old and high use water meters Shire
 
  Watermain refurbishment Wallarah Creek  
    Bateau Bay  
  Construct dismantling pits (for pipe scouring)
Tuggerah
 
  Watermain adjustments (Roads & Drainage) Kanwal
 
    The Entrance  
    Long Jetty  
    Gorokan
 
    Charmhaven
 
  Trunk main Mardi to Warnervale (Stage 2) (2)
Watanobbi
 
  Duplication of watermain, The Entrance Bridge (18) The Entrance  
WATER TREATMENT     $250,000
  Riverbank Rehabilitation Yarramalong
 
  Fish ladder at lower Ourimbah Creek Weir (4) Kangy Angy  
WATER PUMP STATIONS     $25,000
  Motorised valve number 7 (10) Mardi
 
GENERAL     $75,000
  Refurbish 2 way radio system (12) Shire
 