The capital works programmes proposed for the above
period are detailed below in:
Rolling
Works Programme Water Supply 2001/2002
Rolling
Works Programme Sewerage 2001/2002
Rolling
Works Programme Water Supply 2002/2003
Rolling
Works Programme Sewerage 2002/2003
Rolling
Works Programme Water Supply 2003/2004
Rolling
Works Programme Sewerage 2003/2004
Rolling
Works Programme Water Supply 2004/2005
Rolling
Works Programme Sewerage 2004/2005
Rolling Works Programme Water Supply 2002/2003
| Asset |
Project |
Location |
Budget Allocation |
WATER
|
|
|
$3,070,000 |
RESERVOIRS
|
|
|
$190,000 |
| |
Refurbish pumps
at Sandhills Reservoirs
|
Bateau Bay
|
|
| |
Replace roofs at
Sandhills Reservoirs
|
Bateau Bay
|
|
MAINS
|
|
|
$2,530,000 |
| |
Replace tapping
bands/fittings |
Toowoon Bay |
|
| |
|
Blue Haven
|
|
| |
|
Gorokan
|
|
| |
Refurbish corroded
steel mains (1) |
Wyong
|
|
| |
Install valve bypasses |
Wadalba
|
|
| |
Replace old and
high use water meters |
Shire
|
|
| |
Watermain refurbishment |
Wallarah Creek |
|
| |
|
Bateau Bay |
|
| |
Construct dismantling
pits (for pipe scouring)
|
Tuggerah
|
|
| |
Watermain adjustments
(Roads & Drainage) |
Kanwal
|
|
| |
|
The Entrance |
|
| |
|
Long Jetty |
|
| |
|
Gorokan
|
|
| |
|
Charmhaven
|
|
| |
Trunk main Mardi
to Warnervale (Stage 2) (2)
|
Watanobbi
|
|
| |
Duplication of watermain,
The Entrance Bridge (18) |
The Entrance |
|
| WATER TREATMENT |
|
|
$250,000 |
| |
Riverbank Rehabilitation |
Yarramalong
|
|
| |
Fish ladder at lower
Ourimbah Creek Weir (4) |
Kangy Angy |
|
| WATER PUMP STATIONS |
|
|
$25,000 |
| |
Motorised valve
number 7 (10) |
Mardi
|
|
| GENERAL |
|
|
$75,000 |
| |
Refurbish
2 way radio system (12) |
Shire
|
|
Page last updated: 31/10/2002
|