The capital works programmes proposed for the above
period are detailed below in:
Rolling
Works Programme Water Supply 2001/2002
Rolling
Works Programme Sewerage 2001/2002
Rolling
Works Programme Water Supply 2002/2003
Rolling
Works Programme Sewerage 2002/2003
Rolling
Works Programme Water Supply 2003/2004
Rolling
Works Programme Sewerage 2003/2004
Rolling
Works Programme Water Supply 2004/2005
Rolling
Works Programme Sewerage 2004/2005
Rolling Works Programme Water Supply 2003/2004
| Asset |
Project |
Location |
Budget Allocation |
WATER
|
|
|
$9,855,000 |
RESERVOIRS
|
|
|
$100,000 |
| |
Repaint Doyalson
Reservoir
|
San Remo
|
|
| |
Replace roofing
at Treelands Reservoir
|
Jilliby
|
|
MAINS
|
|
|
$3,180,000 |
| |
Replace tapping
bands/fittings |
The Entrance |
|
| |
|
Berkeley Vale
|
|
| |
|
Lake Haven |
|
| |
Refurbish corroded
steel mains (1) |
Charmhaven
|
|
| |
Install valve bypasses |
Wadalba
|
|
| |
Replace old and
high use water meters |
Shire
|
|
| |
Watermain refurbishment |
General |
|
| |
Construct dismantling
pits (for pipe scouring)
|
Mardi
|
|
| |
Watermain adjustments
(Roads & Drainage) |
Lake Haven
|
|
| |
|
Berkeley Vale
|
|
| |
|
Gwandalan |
|
| |
|
The Entrance
|
|
| |
|
Ourimbah
|
|
| |
|
Gorokan
|
|
| |
|
San Remo |
|
| |
|
Budgewoi
|
|
| |
Trunk main Mardi
to Warnervale (Stage 3) (2)
|
Watanobbi
|
|
| |
Connecting main
Berkeley Vale to Ourimbah (14)
|
Berkeley Vale |
|
| WATER TREATMENT |
|
|
$4,000,000 |
| |
New outlet structure
at Mardi Dam (5)
|
Mardi
|
|
| |
Riverbank Rehabilitation |
Yarramalong
|
|
| WATER PUMP STATIONS |
|
|
$2,500,000 |
| |
Mardi high lift
pump station (6) |
Mardi
|
|
| GENERAL |
|
|
$75,000 |
| |
Refurbish
2 way radio system (12) |
Shire
|
|
Page last updated: 31/10/2002
|