The capital works programmes proposed for the above period are detailed below in:

Rolling Works Programme Water Supply 2001/2002
Rolling Works Programme Sewerage 2001/2002

Rolling Works Programme Water Supply 2002/2003
Rolling Works Programme Sewerage 2002/2003

Rolling Works Programme Water Supply 2003/2004
Rolling Works Programme Sewerage 2003/2004

Rolling Works Programme Water Supply 2004/2005
Rolling Works Programme Sewerage 2004/2005


Rolling Works Programme Water Supply 2003/2004

Asset Project Location Budget Allocation
WATER
    $9,855,000
RESERVOIRS
    $100,000
  Repaint Doyalson Reservoir
San Remo
 
  Replace roofing at Treelands Reservoir
Jilliby
 
MAINS
    $3,180,000
  Replace tapping bands/fittings The Entrance  
    Berkeley Vale
 
    Lake Haven  
  Refurbish corroded steel mains (1) Charmhaven
 
  Install valve bypasses Wadalba
 
  Replace old and high use water meters Shire
 
  Watermain refurbishment General  
  Construct dismantling pits (for pipe scouring)
Mardi
 
  Watermain adjustments (Roads & Drainage) Lake Haven
 
    Berkeley Vale
 
    Gwandalan  
    The Entrance
 
    Ourimbah
 
    Gorokan
 
    San Remo  
    Budgewoi
 
  Trunk main Mardi to Warnervale (Stage 3) (2)
Watanobbi
 
  Connecting main Berkeley Vale to Ourimbah (14)
Berkeley Vale  
WATER TREATMENT     $4,000,000
  New outlet structure at Mardi Dam (5)
Mardi
 
  Riverbank Rehabilitation Yarramalong
 
WATER PUMP STATIONS     $2,500,000
  Mardi high lift pump station (6) Mardi
 
GENERAL     $75,000
  Refurbish 2 way radio system (12) Shire
 