The capital works programmes proposed for the above
period are detailed below in:
Rolling
Works Programme Water Supply 2001/2002
Rolling
Works Programme Sewerage 2001/2002
Rolling
Works Programme Water Supply 2002/2003
Rolling
Works Programme Sewerage 2002/2003
Rolling
Works Programme Water Supply 2003/2004
Rolling
Works Programme Sewerage 2003/2004
Rolling
Works Programme Water Supply 2004/2005
Rolling
Works Programme Sewerage 2004/2005
Rolling Works Programme Water Supply 2004/2005
| Asset |
Project |
Location |
Budget Allocation |
WATER
|
|
|
$3,460,000 |
RESERVOIRS
|
|
|
$100,000 |
| |
Repaint Tuggerah
2 Reservoir |
Mardi
|
|
MAINS
|
|
|
$3,310,000 |
| |
Replace tapping
bands/fittings |
The Entrance |
|
| |
|
Berkeley Vale
|
|
| |
|
Lake Haven |
|
| |
Refurbish corroded
steel mains (1) |
Charmhaven
|
|
| |
Install valve bypasses |
Wadalba
|
|
| |
Replace old and
high use water meters |
Shire
|
|
| |
Watermain refurbishment |
General |
|
| |
Construct dismantling
pits (for pipe scouring)
|
Mardi
|
|
| |
Watermain adjustments
(Roads & Drainage) |
Tuggerawong
|
|
| |
|
San Remo
|
|
| |
|
North Entrance
|
|
| |
|
The Entrance
|
|
| |
|
Ourimbah
|
|
| |
|
Gorokan
|
|
| |
|
Budgewoi
|
|
| |
Trunk main Mardi
to Warnervale (Stage 4) (2)
|
Warnervale
|
|
| |
Trunk main Sparks
Road (15)
|
Warnervale
|
|
| |
Trunk main Gorokan
to Norah Head (16) |
Toukley |
|
| |
Connecting main
Gwandalan to
Summerland Point (17) |
Gwandalan
|
|
| WATER TREATMENT |
|
|
$50,000 |
| |
Riverbank Rehabilitation |
Yarramalong
|
|