The capital works programmes proposed for the above
period are detailed below in:
Rolling
Works Programme Water Supply 2001/2002
Rolling
Works Programme Sewerage 2001/2002
Rolling
Works Programme Water Supply 2002/2003
Rolling
Works Programme Sewerage 2002/2003
Rolling
Works Programme Water Supply 2003/2004
Rolling
Works Programme Sewerage 2003/2004
Rolling
Works Programme Water Supply 2004/2005
Rolling
Works Programme Sewerage 2004/2005
Rolling Works Programme Sewerage 2004/2005
| Asset |
Project |
Location |
Budget Allocation |
SEWERAGE
|
|
|
$4,495,000 |
SEWAGE PUMP
STATIONS
|
|
|
$945,000
|
| |
Upgrade C2 (1) |
Charmhaven
|
|
| |
Upgrade mechanical
& electrical equipment at:- |
|
|
| |
WS1 |
Chittaway
|
|
| |
WS4 |
Chittaway
|
|
| |
Refurbish switchboards
|
Bateau Bay &
Mannering Park |
|
| |
Replace worn pumps |
Shire
|
|
| |
Refurbish pipes/valves |
Wyong South &
Bateau Bay Catchments
|
|
| |
Modify stations
to allow connection to diesel generators (10 stations) |
Shire
|
|
| |
Provide on site
diesel generators within catchments |
Bateau Bay |
|
| |
|
Toukley
|
|
| |
|
Wyong South |
|
| |
|
Northern Areas
|
|
| |
Replace
heavy cast iron lids with lightweight lids (6 stations)
|
Shire
|
|
MAINS
|
|
|
$400,000 |
| |
Rehabilitate root
damaged sewers
|
Buff Point |
|
| |
|
Halekulani
|
|
| |
|
Tumbi
|
|
| |
|
Berkeley Vale
|
|
| |
Refurbish effluent
disposal mains (6) |
Wyong South |
|
| |
|
Charmhaven |
|
| SEWAGE TREATMENT |
|
|
$3,150,000 |
| |
General plant mechanical
refurbishment |
Bateau Bay |
|
| |
|
Toukley
|
|
| |
|
Wyong South
|
|
| |
|
Gwandalan
|
|
| |
|
Mannering Park |
|
| |
|
Charmhaven
|
|
| |
Overhaul dewatering
equipment (7) |
Charmhaven
|
|
| |
Augmentation of
Charmhaven STW (5)
|
Charmhaven
|
|