The capital works programmes proposed for the above
period are detailed below in:
Rolling
Works Programme Water Supply 2001/2002
Rolling
Works Programme Sewerage 2001/2002
Rolling
Works Programme Water Supply 2002/2003
Rolling
Works Programme Sewerage 2002/2003
Rolling
Works Programme Water Supply 2003/2004
Rolling
Works Programme Sewerage 2003/2004
Rolling
Works Programme Water Supply 2004/2005
Rolling
Works Programme Sewerage 2004/2005
Rolling Works Programme
Sewerage 2001/2002
| Asset |
Project |
Location |
Budget Allocation |
SEWERAGE
|
|
|
$10,642,000 |
SEWAGE PUMP
STATIONS
|
|
|
$5,090,000 |
| |
Upgrade B3 (1) |
Killarney Vale |
|
| |
Upgrade B4 and Rising
Main (1) |
Killarney Vale |
|
| |
Upgrade mechanical
& electrical equipment at:- |
|
|
| |
* WS8 |
Tuggerah
|
|
| |
* WS9 |
Tuggerah
|
|
| |
Upgrade B9 and Rising
Main (1) |
The Entrance
|
|
| |
Upgrade B1 and Rising
Main (1) |
Shelly Beach |
|
| |
Odour control equipment
at:- |
|
|
| |
* C18 |
Warnervale
|
|
| |
* T15 |
Kanwal
|
|
| |
* WS11 |
Wyong
|
|
| |
Refurbish switchboards |
Bateau Bay &
Mannering Park Catchments |
|
| |
Replace worn pumps |
Shire
|
|
| |
Refurbish pipes/valves |
Bateau Bay &
Wyong South Catchments |
|
| |
Modify stations
to allow connection to diesel generators (10 stations) |
Shire
|
|
| |
Provide
on site diesel generators within catchments:- |
|
|
| |
* B9 |
Bateau Bay |
|
| |
* C13
|
Charmhaven
|
|
| |
Replace heavy cast
iron lids with lightweight lids (6 stations) |
Shire
|
|
| |
Refurbish
Vacuum Pumps WS29/30 |
Tacoma
|
|
| |
Refurbish WS 31 |
Tacoma
|
|
MAINS
|
|
|
$400,000 |
| |
Rehabilitate root
damaged sewers
|
Buff Point |
|
| |
|
Halekulani
|
|
| |
|
Bateau Bay
|
|
| |
|
Berkeley Vale |
|
| |
Refurbish effluent
disposal mains (6) |
Wyong South |
|
| |
|
Charmhaven
|
|
| SEWAGE TREATMENT |
|
|
$4,877,000 |
| |
General plant mechanical
refurbishment |
Bateau Bay |
|
| |
|
Toukley
|
|
| |
|
Wyong South
|
|
| |
|
Gwandalan
|
|
| |
|
Mannering Park |
|
| |
|
Charmhaven
|
|
| |
Augmentation of
Wyong South STW (5) |
Tuggerah
|
|
| |
Enclose sedimentation
tanks, Bateau Bay STW (3) |
Bateau Bay |
|
| |
Install rag screens,
Wyong South STW (10) |
Tuggerah
|
|
GENERAL
|
|
|
$275,000 |
| |
Refurbish 2 way
radio system (8) |
|
|
| |
Upgrade Telemetry
(9) |
|
|